Monthly Archives: February 2013

Connect With Your Neighbors

Next Door is an online private social network of residents within a neighborhood. To see a quick video visit https://nextdoor.com/. In order to join a neighborhood, residents must verify their address is within the neighborhood boundaries through one of four … Continue reading

Posted in Uncategorized | Leave a comment

Highway 4 – Update

Loveridge : Loveridge Road interchange to west of the Somersville Road interchange Segment 1: Somersville Road to Contra Loma Boulevard Segment 2: Contra Loma Boulevard to A-Street/Lone Tree Way Segment 3A: A Street/Lone Tree Way to Hillcrest Avenue Segment 3B: … Continue reading

Posted in Highway 4 Construction | Leave a comment

eBart Videos

Antioch Station Walkthrough eBart Transfer Simulation

Posted in eBART | 1 Comment

SR-4 Sand Creek Rd. Interchange and 4-Lane Widening Project

PROJECT DESCRIPTION Constructs full movement, grade-separated interchange on SR4 at Sand Creek Road. Widens SR4 to 4 lanes from north of Lone Tree Way to Sand Creek Road. Widening at Lone Tree Way interchange constructs second bridge crossing of Lone Tree Way and realigns … Continue reading

Posted in Highway 4 Construction | Leave a comment

VOW to Hire Heroes Act of 2011

The Veterans Opportunity to Work (VOW) to Hire Heroes Act of 2011, provides seamless transition for Servicemembers, expands education and training opportunities for Veterans, and provides tax credits for employers who hire Veterans with service-connected disabilities. The Veterans Retraining Assistance … Continue reading

Posted in Uncategorized | Leave a comment

The Origin of Valentine’s Day

by Reverend Alan Rudnick Today on this Valentine’s Day, the average person will spend $126 on their loved one, which amounts to about $17 billion this year in the United States. An estimated 4 million Americans will propose to their … Continue reading

Posted in Uncategorized | 1 Comment

STATE ROUTE 4 — STATE ROUTE 160 Phase II Connector Project

PROJECT DESCRIPTION Constructs the WB SR4 to NB SR160 ramp and SB SR160 to EB SR4 ramp. Constructs sound wall along NB connector  from end of existing sound wall to Oakley Road. Constructs ramp metering along SB connector. Project construction capital cost estimate is $38.7M. Requires UPRR … Continue reading

Posted in Uncategorized | 1 Comment