Daily Archives: February 24, 2015

SR 4/SR 160 Connector Ramps a Pictorial Update – February 2015

The existing State Route 160/Highway 4 interchange currently includes only two of the four possible interchange movements: the eastbound Highway 4 to northbound State Route 160 connector ramp, and the southbound State Route 160 to westbound Highway 4 connector ramp. … Continue reading

Posted in Highway 4 Construction | Leave a comment