September 28 and 29, 2016 – Vasco Road Safety Project


roadworkContra Costa County Public Works Department will perform roadwork on Vasco Road from the Alameda County line north to Camino Diablo Road on September 28 and 29, 2016. The work will occur between the hours of 9:00 a.m. and 4:00 p.m. to replace roadway delineators.

The purpose of the delineators and rumble strips is to increase driver awareness and safety when travelling through this commute corridor. The work may be rescheduled based on weather conditions. Electronic message boards will alert drivers of the scheduled work. There will be traffic control through the work area and motorists can expect delays.

Advertisements

About Kevin

Mayor - City of Oakley, Data Center Manager of Mainframe Operations and Optimization – USS-POSCO INDUSTRIES, Co-Founder and Board Member - Friends of Oakley A Community Foundation, Advisory Board – Opportunity Junction, Commissioner - Contra Costa Transportation Authority, Board Member - Tri Delta Transit and Transplan
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s