Category Archives: Highway 4 Construction

Interstate 680 / State Route 4 Interchange Improvements

A recent headline announced that the California Transportation Commission approved $34 million in funding for upgrades to the Interstate Highway 680/state Highway 4 interchange. Concord Assemblymen Tim Grayson was active in securing this funding. Because of the size of the … Continue reading

Posted in Highway 4 Construction, Highways | 1 Comment

Laser-equipped Drone Helps Improve Safety and Efficiency on Highway 4 Improvement Project

The Contra Costa Transportation Authority (CCTA) and Alta Vista Solutions showcased two emerging technologies on a construction project aimed to improve commutes on Highway 4. Engineers are piloting drones equipped with light detection and ranging (LiDAR) lasers–a surveying tool that … Continue reading

Posted in Highway 4 Construction | Leave a comment

July 2017 – Balfour Road Update

The Contra Costa Transportation Authority (CCTA) is beginning construction of the new Balfour Road Interchange at Highway 4. The Balfour Road and Highway 4 intersection is currently signalized, resulting in traffic backups during peak commute times. This project will replace … Continue reading

Posted in Highway 4 Construction | Leave a comment

Balfour Road Interchange at Highway 4

On April 11 CCTA and our partners broke ground on the Highway 4 and Balfour Road Interchange Project which will bring much-needed traffic relief to Brentwood and East Contra Costa County. The Balfour Road Interchange project will replace the existing … Continue reading

Posted in Highway 4 Construction | Leave a comment

Explore the Highway 4 Story Through Images

The Contra Costa Transportation Authority (CCTA) announces today the official launch of Story Through Images, a web feature devoted to celebrating the recently-completed Highway 4  Widening Project and ongoing BART construction project, a $1.3 billion investment in infrastructure in Eastern … Continue reading

Posted in Highway 4 Construction | Leave a comment

Contra Costa Transportation Authority Adopts Transformative 30-year Plan and Approves the Placement of Tax Measure on November 8 Ballot

If voters approve the measure, the tax revenue will fund the 30-Year Transportation Expenditure Plan The Contra Costa Transportation Authority (CCTA) believes that the future success of Contra Costa County includes offering safe, reliable mobility for all. To provide funding … Continue reading

Posted in BART, eBART, Highway 4 Construction, Highways, SR 239, Transportation | Leave a comment

They’re Open – State Route 160/Highway 4 Direct Connector Ramps

The existing State Route 160/Highway 4 interchange previously included only two of the four possible interchange movements. The State Route 160/Highway 4 Direct Connector Ramps project created a much-needed connection between the Senator John A. Nejedly (Antioch) Bridge and Highway … Continue reading

Posted in Highway 4 Construction | Leave a comment